Имя | Magripa |
Контакты | Доступны бесплатно после регистрации или входа |
Общая информация
|
Город проживания | Атырау |
Заработная плата | от 300 000 тнг. |
График работы | Полный рабочий день |
Образование |
Высшее |
Опыт работы | 25 лет 5 месяцев |
Пол | Женский |
Возраст | 52 года   (16 апреля 1972) |
Опыт работы
|
Период работы | январь 2017 — февраль 2018   (1 год 2 месяца) |
Должность | QC Engineer of Coating -Insulating and Receiving Activities. |
Компания | SICHIM Kazakhstan SPA |
Обязанности | Participates in inspection of quality control coverage for compliance with the requirements Contracts, procedures and specifications of the Contractor approved by the Client Conducts visual inspections at all stages of coating to meet the requirements of the Specification and records observations Checks the calibration status of all instrumentation, sensors, etc. on verification certificates It monitors and is present during testing of coatings, and also reviews all reports for compliance with standards Fill daily forms of reports on the inspection of coatings Analyzes daily reports of the EUPEC In case of detection of nonconformities, it controls their complete elimination Reports any problems and stops to the Supervisor / Senior Site Inspector |
|
Период работы | январь 2014 — март 2016   (2 года 3 месяца) |
Должность | QA/QC Site Engineer Receiving Incoming control |
Компания | Fluor : Tengizchevroil (TCO) Future Growth Project / Wellhead Management Project (FGPWPMP) 3GP/3GI Expansion Project - |
Обязанности | Preparation of inspection checklists for critical items Inspection of quality of painting and coatings - including pre-cast concrete piles Carry out receipt inspections of critical equipment for verification for compliance with TCO project standards and purchase order requirements Preparation of material receipt inspection reports Review of supplier documentation and QC data packages Identification of items non-complying with project requirements and initiation of Material Deficiency Reports Verifying that agreed resolutions for non-conforming items are implemented. Carry out surveillance inspections and preparation of reports Perform regular audits of items in storage to verify storage arrangements comply with purchase orders, vendor recommendations and project standards Preparation of monthly storage audit reports Perform inspections in accordance with Notifications for Inspections (NFIs), and report inspection results Attendance at weekly team and contractor meetings Promote quality policy and awareness in all dealings with the project team and contractors Working in accordance with project QAQC procedures and Site Quality Manual Assuring that safety procedures are followed and making safety observations and entering BBS safety reports |
|
Период работы | январь 2014 — март 2016   (2 года 3 месяца) |
Должность | Participates in inspection of quality control coverage for compliance with the requirements Contracts, procedures and sp |
Компания | Fluor : Tengizchevroil (TCO) Future Growth Project / Wellhead Management Project (FGPWPMP) 3GP/3GI Expansion Project - |
Обязанности | Painting/Insulation Inspector and Supervisor - Verification of drawings, procedure reviewing, supervision and inspection work of corrosion, coating, painting, insulation and fireproofing work. - Coordinate with other sections of contractor such as piping, civil, structures, equipments installation etc to minimize interfacing problems. - Perform inspection and supervision of quality of work for painting, coating, insulation and fire proofing to meet project specifications. - Supervise and coordinate the painting / coating, insulation and fire proofing activities to ensure work schedule meets dateline. - Perform surveillance, activities monitoring, and witness and verify all aspects with regards to painting, thermal coating etc from pre treatment, surface preparation, and application, pre-inspection with contractor or subcontractor before final inspection. - Witness and verify all aspects with regards to insulation from material take off from drawings, line and area check to identify insulation requirement, material quality during delivery, and fabrication of foam glass, calcium silicate etc for installation of cold and hot insulation. - Ensure proper implementation of Quality Control system. Ensure that installation conforms to the quality requirement of the company and that of the customers. - Prepare site audit plan, schedule and report. Conduct analysis on site defects as well as to ensure that all sites meets its quality standard. - Familiar with relevant codes and standards, oil and gas industry construction practices and procedure i.e. NACE, SSPC, ISO, ASTM, AP1, CINI, ASME, ANSI, BS. - Monitor defects and scraps and highlight such activities to contractor and ensure the defect is rectified. - Ensure safety and quality procedures are being effectively and consistently implemented by the contractor or subcontractors. |
|
Период работы | январь 2011 — январь 2014   (3 года 1 месяц) |
Должность | QA/QC Site Engineer of Coating and insulation |
Компания | "Bureau Veritas KIS" |
Обязанности | More than 8 years of experiences in Oil and Gas, Petrochemical construction industries as a Painting/Insulation Inspector and Supervisor - Verification of drawings, procedure reviewing, supervision and inspection work of corrosion, coating, painting, insulation and fireproofing work. - Coordinate with other sections of contractor such as piping, civil, structures, equipments installation etc to minimize interfacing problems. - Perform inspection and supervision of quality of work for painting, coating, insulation and fire proofing to meet project specifications. - Supervise and coordinate the painting / coating, insulation and fire proofing activities to ensure work schedule meets dateline. - Perform surveillance, activities monitoring, and witness and verify all aspects with regards to painting, thermal coating etc from pre treatment, surface preparation, and application, pre-inspection with contractor or subcontractor before final inspection. - Witness and verify all aspects with regards to insulation from material take off from drawings, line and area check to identify insulation requirement, material quality during delivery, and fabrication of foam glass, calcium silicate etc for installation of cold and hot insulation. - Ensure proper implementation of Quality Control system. Ensure that installation conforms to the quality requirement of the company and that of the customers. - Prepare site audit plan, schedule and report. Conduct analysis on site defects as well as to ensure that all sites meets its quality standard. - Familiar with relevant codes and standards, oil and gas industry construction practices and procedure i.e. NACE, SSPC, ISO, ASTM, AP1, CINI, ASME, ANSI, BS. - Monitor defects and scraps and highlight such activities to contractor and ensure the defect is rectified. - Ensure safety and quality procedures are being effectively and consistently implemented by the contractor or subcontractors. |
|
Период работы | январь 2009 — январь 2011   (2 года 1 месяц) |
Должность | QA/QC Site Engineer of Coating and Insulation |
Компания | “CCEPC” Consolidated Contracting Engineering and Procurement Company |
Обязанности | Worked in accordance with company approved method statements and QA QC procedures. Fully conversant with a diverse range of coatings paints, paint, techniques, and specialized coatings such as; Spray Applied Coatings, Pipe Coatings, Fireproofing Check tests of concrete before start of application on the steel structural or pipe Responsible to issue Request for Inspection (RFI) and relevant Acts. Inspected parts using micrometers, calipers, and gauges, special for thickness, humidity, dew point, and temperature. Responsibilities for training new employees Responsible for in-process, visual and final inspection Performed quality assurances tests on materials, products and issued Acts of defects if applicable. Responsible to issue Request for Materials (RFM). Completed final inspection prior to transfer. Utilized computer to complete packaging and shipping information. Identified and eliminated surface defects. Labeled final product per job order specifications. Participated in team meetings to discuss quality issues. Weighed final product in order to determine shipping method. |
|
Период работы | январь 2006 — январь 2009   (3 года 1 месяц) |
Должность | QA/QC Site Engineer |
Компания | Power Comm LLC |
Обязанности | Worked in accordance with company approved method statement and QAQC procedures. Responsible for in process, visual and final inspection Performed quality assurance tests on materials, products and issued Acts of defects if applicable. Responsible to issue Request for Materials (RFM). Completed final inspection prior to transfer. Utilized computer to complete packaging and shipping information. Identified and eliminated surface defects. Participated in team meetings to discuss quality issues. Weighed final product in order to determine shipping method. |
|
Период работы | январь 2005 — январь 2007   (2 года 1 месяц) |
Должность | Receiving QA/QC Inspector |
Компания | Power Comm LLC |
Обязанности | Material Delivery Expediting to Contractor Storage in Base, Material Registr, Material Database list update and creation. Solving problems with delivery dates, certificates, material and documentation Discrepancy, reporting dates to contract and other departments. Work with Supply Chain, and Suppliers |
|
Период работы | январь 2002 — январь 2004   (2 года 1 месяц) |
Должность | Materials Lead Expeditor |
Компания | Power Comm LLC |
Обязанности | Providing effective management and control of Material, Co-ordination activities pertaining to Material and Supply Chain (HUC). Coordinating a team of expeditors, in the areas of expediting and shipping to ensure that the requirements coming from RoS Plans are met with efficiency and effectiveness. Providing an interface with the Engineering, Site Materials Management, Contracts team, SCM Dept., as well as the main contractors and third party field expeditors, while maintaining a high level of service in the supply chain process. Developing reporting tools for HUC project and maintain guidance for the Team of expeditors to produce weekly reporting to Management. Continue developing Integrated Procurement Management System (IPMS-owned by KBR) for the purpose of Expediting and Material Traceability for all purchase orders. Maintaining the interfaces with the Materials team to ensure alignment and consistency between the material procurement plans and shipping plans. Establishing and maintaining a close interface with the SCM department to ensure a clear flow of information granting effective means of communication in order to proactively respond to any potential risk of shipment plan slippage. Liaising with the Site Materials Coordinators to collect and information on material delivery status and to solve any other issues related to the completion of the RoS plans. Constantly maintaining and issuing a complete and update shipping status report for all materials related to the HUC project scope . |
|
Период работы | январь 1998 — январь 1999   (1 год 1 месяц) |
Должность | Site Superviser |
Компания | LLP Balkan Bekhtel-Enka |
Обязанности | Prepared forms for payroll and sending to client. Checked and corrected titles done by subcontractors for oil and gas lease to be paid. Preparing legal document pertaining to oil and gas leasing. Adding information to spreadsheet and keeping up to date with leasehold. Entered information into the ELPR (Electronic Lease Prepared Report). Updating maps with leasehold to which the landowner is leased. Entered data into 1099s and year-to-date forms for subcontractors. Searching oil and gas reservations in real estate titles in Potter County to 1890s. Answered the telephone and represented the company in a professional and businesslike manner. Data entered into Microsoft Office (Word, Excel). |
|
Период работы | январь 1993 — январь 1997   (4 года 1 месяц) |
Должность | Superviser |
Компания | LLP Tengiz Dor Stroi |
Обязанности | Supervised and scheduled new construction and repairs works. Ensured that all assigned works are completed on time with total emphasis on Safety and Quality. Prepared Cost estimates of Works and interpreting Contracts. Executed construction work with coordination of mechanical, electrical and instrumentation disciplines. Coordinated inter and intra Department Supervisors and Contractors for smooth function of work. Ensured proper preparation and presentation of timesheets, records and reports. |
|
Период работы | январь 1992 — январь 1993   (1 год 1 месяц) |
Должность | Store Manager |
Компания | LLP Tengiz |
Обязанности | An ethical, loyal, energetic, "make-it-happen" professional able to accelerate sales growth and positively impact the bottom line through effective product education and extensive relationship building. Respected for integrity. Persistent in pursuit to build sales and provide solutions according to identified customer needs. Strong customer-service orientation, demonstrated by established credibility and leverage with healthcare clients. Possess an unshakable determination when challenged with strong personalities, demanding deadlines, and the rigorous assimilation of technical information. Successful in autonomous and collaborative settings |
|
Период работы | январь 1989 — январь 1990   (1 год 1 месяц) |
Должность | Site Manager |
Компания | LLP Tengiz Oil Gas |
Обязанности | Prepare and mail out invoices daily. Organize and track purchase orders. Assist with processing payments. Handle delivery queries. Liaise with customers and suppliers. Create and maintain customer databases. Prepare correspondence, memos and quotes. Send out email marketing campaigns. Receive and assist customers and visitors. Assist with the organization of promotions and events. |
Образование
|
Образование | Высшее |
Окончание | 1992 год |
Учебное заведение | Russian, Kazan : Qualification- management -marketing |
Специальность | Qualification- management -marketing |
|
Образование | Высшее |
Окончание | 2005 год |
Учебное заведение | Kazakh Academy of Transport and Communication named M Tynyshpayev |
Специальность | Qualification - Mechanical Engineer |
Дополнительная информация
|
Иностранные языки | Английский (Свободный), Русский (Свободный) |
Владение компьютером | Уверенный пользователь |
Курсы и тренинги | Certificate for 1C (accounting) Recommendation letter from LLC INECO Atyrau Leigh Paints England certificate Firetex M 90, Epoxy Passive Fire Protection System Bosiet OFFSHOR Certificate Agip Personnel HSE Passport. TCO Certificate of quality control № 290 from 11/02/2014 TCO Certificate of Industrial safety № 13P/1987/01 from 12/02/2014 till 12.02.2017 TCO Certificate of Fire safety & ANSUL extinguisher from 27/02/2014 till 27/02/2019 TCO Certificate of Lifting and Rigging Operations from 06/06/2014 till 06/06/2017 TCO Certificate of Isolation of Hazardous Energy from03/03/2014 till 03/03/2017 TCO Certificate of Confined Space Entry from 01/03/2014 till 01/03/2017 TCO Certificate of Safety Excavation Practices Overview Course from 01/03/2014 till 01/03/2017 TCO Certificate of Working at heights from 04/03/2014 till 04/03/2017 TCO Certificate of PTW & JHA from 25/04/14 till 25/04/17 TCO Certificate of Respirator Protection Equipment training from 28/02/14 till 28/02/17 |
Навыки и умения | PC: MS (Word, Excel, Outlook SAP, Advanced PC user, Microsoft Office, Adobe Acrobat, Professional, Internet |