Piping Construction Supervisor

Резюме 209128   ·   9 октября 2017, 11:54

Имя

Аибек

Контакты

Доступны бесплатно после регистрации или входа


Общая информация


Город проживания

Атырау

Заработная плата

от 400 000 тнг.

График работы

Полный рабочий день / Вахтовый метод работы


Образование


Высшее

Опыт работы

15 лет 5 месяцев

Пол

Мужской

Возраст

46 лет   (4 апреля 1978)


Опыт работы


Период работы

ноябрь 2015 — по настоящее время   (9 лет 1 месяц)

Должность

Piping Construction Supervisor

Компания

“South Tambey LNG- Consortium of Technip,

Обязанности

Site supervision pertaining to structural and piping erection as per design and specifications.
Closely work with Contractor for Execution Quality Performance.
Coordinating with Procurement Department and Stores for the Material Availability in the Site.
Preparation Daily Report of piping activities to the Field Superintendent
Line check for punch list.
Organize the safety and day to day operations to maximize efficiency.


Период работы

февраль 2013 — октябрь 2015   (2 года 9 месяцев)

Должность

Mechanical Engineer of Author Supervision Team

Компания

“CBS” (Caspian Business Support)

Обязанности

Site Supervision of piping installation /Mechanical Equipment /HVAC system as per Company Specification and Standards & Norms of RoK.
Acceptance of all Mechanical & Piping activities as per Standards & Norms of RoK.
Compliance of project documentation with local body


Период работы

август 2011 — декабрь 2012   (1 год 5 месяцев)

Должность

Commissioning Supervisor

Компания

“Petrofac“ (Petroleum Facilities Engineering and Construction)

Обязанности

Representing the Client Agip KCO on site;
Supporting the Commissioning Start-up Manager in controlling/managing the execution of :
Commissioning & start-up activities associated with plant process lines;
Support the Commissioning Start-up Manager in planning and monitoring (schedule, cost and compliance of work to project specifications);
Reporting the progress and costs trends to the Commissioning Start-up Superintendent;
Planning and coordination of contractors and subcontractors work scopes;
Verifying that Contractors respect all the relevant HSEQ procedures and regulations;
Approval of the commissioning plans and procedures relevant to fabrication, test and installation of process piping lines;
Review/approve the Contractor‘s commissioning and testing procedures;
Monitoring Punch lists population, follow-up and clearance;
Supervising the Contractors work process (Engineering, Work permits, Manpower, Equipment, Materials, Testing and Re-instatement activities);
Commissioning of Utility lines (Utility and Potable Water, Utility and Instrument Air) in the plant;
Coordination of all preparation works for Leak Testing Activities (scaffolding installation and insulation removal/re-instatement, equipment transfer, mechanical isolation, etc.);
High pressure and low pressure Steam lines Steam Blow Activities and Systems line-up coordination;
Coordination of N2/He and Air/He Leak testing and Chemical Cleaning;
Joint Integrity Management (Controlled Bolt tensioning and torqueing of critical Joints);
Plant Fire Water Network Maintenance Control (Hydrants, Fire Monitors, Deluge skids);
Ensuring that works are performed according to project specifications, international rules and schedule
Supporting the preparation of the necessary certificates for handing-over the facilities to Operations


Период работы

декабрь 2008 — август 2011   (2 года 9 месяцев)

Должность

Mechanical Equipment / Piping Construction Supervisor

Компания

“Petrofac“ (Petroleum Facilities Engineering and Construction)

Обязанности

Representing the Client Agip KCO on site;
Conduct mechanical equipment / piping inspection as per the ITPs
Site monitoring of equipment installation such Foundation padding & center coordinate line / anchor bolts check prior to installation.
Site Supervision of Installation of Rotating Pumps /Compressors/Heat Exchangers/Air Fin Fan Coolers / Static equipment vessel etc.
Validation RFI of Equipment Vertical /Horizontal Alignment / Elevation prior to release for mechanical Base grouting
Pre check Coupling alignment of rotating pumps / compressors included motor soft foot adjustment in tolerances release for final grouting
Rotating equipment Final alignment check with Hook up Suction / Discharge flanges without any stress on pump section and ensure bolts tightened as per specification / vendor procedures
Supervision of static equipment internal cleaning prior to internal assembly installation such as internal Trays supports / Assembly trays installation
Carry out internal trays bolts tighten inspection prior temporary closed internal man ways and release to final box up teams.
Monitor piping components are stored properly
Check piping is kept clean during storage and installation
Inspect final welding including visual welding inspection, preparation on the daily welding reports
Inspect pipelines after completion to ensure all components as per the drawing and report deficiencies on the pre-hydro punch list
Accept hydro test, Flushing and acceptance for reinstatement
Monitor the supervision of the work being undertaken by the subordinate’s Engineers and site Supervisors, taking any necessary remedial action to ensure full compliance with all relevant standards, contract documents, specifications, method statements, policies and procedures.
Regular inspection of condition of working places prior starting work, organization of the elimination of identified deviations by team members and implementing corrective actions and reporting them to Superintendent.
Ensuring that workers under control are competent and trained for the tasks they need to perform.
Performing/ attending daily toolbox talks with work crews at the work place to discuss the relevant safe work methods for tasks to be performed.


Период работы

май 2006 — декабрь 2008   (2 года 8 месяцев)

Должность

“GATE Inshaat Taayukhut Sana & ve Tidzharet JSC”

Компания

Piping Engineer

Обязанности

Compiling of daily report of the welding activities. Collection & data processing of welded joints according to the drawings, registration of data for each welded joint
Executed work documentation as per SNiP of RoK
(Logging of construction activities, welding log, & thermal treatment logbook and etc.).
Filling up the Work permits for execution of construction activities


Период работы

сентябрь 2005 — май 2006   (9 месяцев)

Должность

Mechanical Engineer

Компания

LTD “Munai Kurylys Emba”

Обязанности

Logging of construction works, composition of as-built documentation
(Hidden Works ACTS, Implementation as fitted drawings of the design drawings, Act of testing of machines and equipment, pipelines, tanks, Acceptance Acts of construction activities for exploitation and many similar acts)
Cooperation with the Client & contractors with respect to timely execution of the scope of work


Период работы

июнь 2002 — июнь 2005   (3 года 1 месяц)

Должность

Driver of light vehicle in the construction department

Компания

Consortium “ССС-Saipem”

Обязанности

Project: Construction of rotational camp /Karachaganak Develpoment Project. Construction of Pump Station


Образование


Образование

Высшее

Окончание

2004 год

Учебное заведение

Atyrau Oil & Gas Institute

Специальность

Mechanical Technician


Дополнительная информация


Иностранные языки

Английский (Свободный), Немецкий (Базовый), Русский (Свободный)

Водительские права

Категории B, C

Владение компьютером

Уверенный пользователь

Курсы и тренинги

PTW Certificate - Agip KCO
RoK Industrial Safety (Blue Book)
H2S Level 1&2 OPITO, Onshore HSE Sour Oil & Gas Induction Training, Face Fit Test Training
Supervisor training
Working at height& Confined Space Entry Trainings

Навыки и умения

AUTOCAD, Microsoft Word/Excel/Power Point/Outlook, Internet,
Integrated Management Information System (IMIS), AKCO EDMS, SAP,



Другие резюме в Атырау


Координатор системы ipms

от 200 000 тнг.

Атырау

Кассир

договорная

Атырау

Logistics Manager

от 600 000 тнг.

Атырау

Инженер

от 100 000 тнг.

Атырау

Водитель

договорная

Атырау

Парекмахер-стилист

от 150 000 тнг.

Атырау

Бухгалтер

от 300 000 тнг.

Атырау

Разнорабочи

договорная

Атырау

Safety

от 200 000 тнг.

Атырау

Электрик монтажник

от 150 000 тнг.

Атырау